[ X - Adult: No readers under 18. Contains Graphic Adult Themes/Extreme violence. ]
By: HappyDragon 
Post CoM: Riku lost to Ansem, but Ansem still couldn’t regain control over him. Ansem, however, isn't above fighting dirty to win this stalemate. Can Riku hold on until Sora awakens? Abuse,Anal,Angst,Bi,F/M/M,Language,M/M,M/M/M,Minor,N/C,Oral,WAFF,WIP
Originally done for another site, the format might be odd. I still expect people to review, as I will answer them. Besides, I like knowing what people think of my writing, so I can fix things.
Main focus is Non-Con Ansem/Riku. Second lead is AkuRoku (Axel/Roxas). There is mentioned (if not actual) AkuDeku (Axel/Demyx), mentioned Zemyx (Zexion/Demyx), and implications of Xigbar/Demyx, as well as Xigbar/Xaldin. And the ever popular Xemnas/Saix. (Or as I like to call it 'ManSaix'.) There is also planned SoRiKai (Sora/Riku/Kairi) for the ending.
I'm just trying to figure out where I can shove in the DekuAkuRoku, although it looks like I'll have to take that out, and the M/M/M warning with it . . . . Unless Xigbar has his way. At that point all bets will be off.
Fair warning, there are Het pairing lurking around this fiction too, and probably some F/F ones that I don't know about yet.
Still, dark, angst-ridden, insane, and ongoing, you have been warned. And warnings before each chapter to give you an idea of the craziness. . . .
Non Anime: Kingdom Hearts Fan Fiction |
Genre(s): Angst /
Romance /
Psychological /
Hentai /
Comedy |
Type: Alternate Universe |
Uploaded On: 03.09.2010 |
Pages: 208 |
Words: 247.1K |
Visits: 12.4K |
Status: No Chapters